Prices and bills
What are non-commodity costs on a business energy bill?
Non-commodity costs are everything on your bill that is not the wholesale price of the energy itself: network charges, balancing costs, environmental and social schemes, and tax. They typically make up around half of a fully delivered business rate.
Updated 21 September 2026. Checked against the sources listed below.

Non-commodity costs cover moving electricity or gas to your premises and the government and industry schemes layered on top of the wholesale price: network charges (DUoS, TNUoS), balancing costs (BSUoS), low-carbon and renewable support schemes (CfD, the Renewables Obligation, Feed-in Tariffs), the Capacity Market, and the Climate Change Levy. Each is set independently, by a different body, and each can change without you switching supplier.
Wholesale energy is only part of what a supplier charges you for. The rest is a collection of separate costs for moving electricity and gas to your premises, keeping the network balanced, and funding government and industry schemes, most of which have nothing to do with how much energy you actually use. These are usually grouped together as non-commodity costs. This guide sets out what each one is, who administers it, and how it reaches your bill.
What counts as a non-commodity cost?
Anything on your bill that is not the wholesale price of the electricity or gas itself. Our guide to how wholesale energy prices work covers the commodity side. Non-commodity costs sit on top of it, and typically fall into four groups:
| Group | What it covers | Examples |
|---|---|---|
| Network charges | Moving energy from generators to your premises | DUoS, TNUoS, and their gas equivalents |
| Balancing and system costs | Keeping supply and demand matched in real time | BSUoS, the Capacity Market |
| Environmental and social schemes | Government and industry support for low-carbon generation and energy efficiency | CfD, the Renewables Obligation, Feed-in Tariffs |
| Tax and other charges | Government levies and supplier costs | Climate Change Levy, metering, supplier operating costs and margin |
Ofgem’s own glossary for non-domestic energy customers describes wholesale costs as roughly half of a typical business bill, with these non-commodity elements making up most of the rest, alongside supplier costs and margin. The exact split varies with your contract, your usage profile and how much of your bill is metering and admin.
Quick reference: who administers what
| Charge | Fuel | Who administers it | What it funds |
|---|---|---|---|
| DUoS | Electricity | Your regional DNO | The local distribution network |
| TNUoS | Electricity | NESO | The national transmission network |
| BSUoS | Electricity | NESO | Real-time balancing of supply and demand |
| Capacity Market | Electricity | NESO (EMR Delivery Body) | Retainer payments for guaranteed future capacity |
| CfD Supplier Obligation | Electricity | Low Carbon Contracts Company | Contracts for Difference payments to low-carbon generators |
| Renewables Obligation | Electricity | Ofgem | Support for accredited renewable generation |
| Feed-in Tariffs | Electricity | Ofgem | Payments to small-scale renewable generators under closed scheme |
| Climate Change Levy | Electricity and gas | HMRC | General taxation, with a stated environmental purpose |
| Gas transportation charges | Gas | National Gas and regional gas distributors | The national and local gas networks |
This is a reference point, not an exhaustive list. Your bill may also include metering charges, supplier administration costs and, where you switched through a broker, a broker fee, none of which are government or industry schemes.
What is DUoS?
Distribution Use of System (DUoS) charges pay for the local network of cables and substations that carries electricity the last leg to your premises. National Grid Electricity Distribution, one of Great Britain’s regional electricity distributors, describes DUoS as covering “the costs of maintaining the distribution networks supplying electricity.” Each of the 14 regional Distribution Network Operators (DNOs) publishes its own charging statement, because local networks differ in age, geography and how much investment they need.
DUoS is commonly billed using time bands, often described as red, amber and green, that make electricity more expensive to use at peak demand periods, typically weekday early evenings, and cheaper overnight and at weekends. Not every DNO uses identical band hours, so check your own bill or your supplier for the times that apply to your site. This structure is designed to encourage businesses to shift flexible demand away from the network’s busiest periods, and it is one of the few non-commodity costs a business can influence through its own behaviour, alongside its agreed supply capacity.
What is TNUoS?
Transmission Network Use of System (TNUoS) charges pay for Great Britain’s high-voltage transmission network, the national backbone that carries electricity in bulk from power stations to the regional distribution networks. NESO, which now runs this charging regime, explains that TNUoS charges “recover the costs associated with installing and maintaining” the transmission system across England, Wales, Scotland and offshore.
Generators pay TNUoS based on their connected capacity, and suppliers pay based on the demand of the customers they serve, with tariffs varying by the geographical zone a site is connected in. NESO publishes final tariffs annually by 31 January, to take effect from the following 1 April, with draft figures and forecasts published earlier in the cycle so suppliers can plan ahead.
What is BSUoS?
Balancing Services Use of System (BSUoS) charges recover what it costs NESO to keep the grid balanced from one moment to the next. NESO describes BSUoS as covering “the cost of day-to-day operation including the cost of balancing the electricity transmission system,” which includes paying generators and demand-side providers to adjust their output through the Balancing Mechanism, plus other ancillary services that keep the system stable.
Since April 2023, BSUoS has used a fixed tariff model. A change to the industry rules, CMP361, introduced an “ex-ante fixed BSUoS tariff” set in advance for each six-month period, and another change, CMP308, moved the cost of BSUoS onto final demand only, so generators no longer pay it directly. In practice this means your supplier pays a published rate per MWh of demand, which changes twice a year rather than moving with every half-hourly balancing action.
What is the Capacity Market and why does it appear on my bill?
The Capacity Market pays some generators and demand-side providers to guarantee they will be available at the times electricity supply is tightest, funded by a charge added to electricity bills. NESO runs the scheme as the Electricity Market Reform Delivery Body, and describes its purpose as making sure Great Britain “has enough electricity to meet future demand” at the lowest reasonable cost to consumers.
Capacity is secured through auctions, held roughly a year and four years ahead of the delivery period, using a descending-clock format where NESO works down through bids until it has secured the capacity it needs at the lowest price. Winning providers are paid a retainer to be available; in exchange, suppliers pay a Capacity Market charge that recovers the cost of those retainer payments, typically based on your demand at system peak times.
What is the Contracts for Difference (CfD) scheme?
CfD is the government’s main way of supporting new low-carbon electricity generation, funded by a levy on electricity suppliers. The Low Carbon Contracts Company (LCCC) is the counterparty to every CfD contract: it collects a fixed price from consumers via suppliers and pays generators the difference between that price and the market price they actually achieve, in either direction. LCCC funds this through the CfD Supplier Obligation levy, charged to electricity suppliers in pence per MWh of electricity they supply, with rates set and published in advance on a quarterly basis.
Because CfD payments can run in either direction, in periods of very high wholesale prices, successful CfD generators can end up paying money back through their contracts rather than being paid, which can reduce the net cost of the scheme. The levy rate itself is what appears, indirectly, in your bill.
What is the Renewables Obligation (RO)?
The Renewables Obligation requires electricity suppliers to source a proportion of their electricity from renewable generation, or pay a penalty, with the cost passed through to customers. Ofgem, which administers the scheme, explains that suppliers must present a set number of Renewables Obligation Certificates (ROCs) for each megawatt hour they supply, sourced from accredited renewable generators, or pay into a buy-out fund instead. Money paid into the buy-out fund, after administration costs, is redistributed back to suppliers who did present ROCs.
The RO closed to new renewable generating capacity from 1 April 2017, but it continues to apply to accredited existing generation and remains a live cost on supplier obligations, and therefore on bills, until those existing contracts run their course.
What are Feed-in Tariffs (FIT), and why do I still pay for a closed scheme?
Feed-in Tariffs paid small-scale renewable generators, such as households and small businesses with solar panels, for the electricity they generated, and the scheme’s costs are still shared across all suppliers even though it is closed to new applicants. Ofgem confirms the FIT scheme closed to new applications from 1 April 2019. Existing accredited installations continue to receive payments under their original terms.
The cost of those ongoing payments is spread across all licensed electricity suppliers in Great Britain through a process called levelisation, in proportion to each supplier’s share of the electricity market. Suppliers then recover this cost from their customers, which is why the closed scheme still shows up, in effect, on current bills.
What is the Climate Change Levy (CCL)?
The Climate Change Levy is a tax on the energy businesses use, charged per kWh on both electricity and gas, unless an exemption or discount applies. From 1 April 2025, HMRC’s main rates are 0.775p/kWh for both electricity and gas, rising to 0.801p/kWh from 1 April 2026, and an announced 0.827p/kWh from 1 April 2027. Holders of a Climate Change Agreement can get a 92% discount on electricity and 89% on gas. Because CCL is a straightforward per-kWh tax rather than a scheme with a complex charging basis, it is usually the easiest non-commodity cost to spot on your bill. Our Climate Change Levy guide covers exemptions, reduced rates and how to claim a Climate Change Agreement discount.
How do gas non-commodity costs differ?
Gas has its own equivalents of some of these charges. National Gas charges for use of the national transmission system, and the regional gas distribution networks charge separately for moving gas the final distance to your premises, in a similar way to DUoS for electricity. The Climate Change Levy applies to gas as well as electricity. However, CfD, the Renewables Obligation, Feed-in Tariffs and the Capacity Market are electricity-only schemes, because they exist to support and balance electricity generation specifically.
Can these costs change during your contract?
It depends on how your contract is priced. Ofgem’s glossary distinguishes fully fixed contracts, where the supplier estimates and bakes in these costs for the term, from pass-through contracts, where some or all of them are charged at their actual cost and can move your bill even though your energy price is fixed. Our guide to fixed versus flexible business energy contracts explains this distinction in more detail, including what to check in your contract’s principal terms before you sign.
Because several of these charges (TNUoS, BSUoS and the Capacity Market in particular) are reset on an annual or twice-yearly cycle by bodies outside your supplier’s control, even a fully fixed contract’s underlying cost base can shift from one contract year to the next, which is one reason renewal quotes do not always move in line with wholesale prices alone.
How can you see these costs on your own bill?
Not every supplier itemises each of these charges separately; some fold them into a single non-commodity or “third-party costs” line. If you want a full breakdown, ask your supplier directly, since Ofgem’s best-practice guidance encourages suppliers to make non-domestic billing transparent. Our guide to reading a business energy bill explains what to look for line by line, and our guide to unit rates and standing charges explains how these costs typically get folded into the two headline figures on your quote.
When you are ready to see how these costs come together in an actual quote, you can compare business energy quotes with us.
Frequently asked questions
What is the difference between commodity and non-commodity costs?
The commodity cost is the wholesale price of the electricity or gas itself. Non-commodity costs are everything else: network charges for moving it to you, balancing and system costs, environmental and social scheme costs, and tax such as the Climate Change Levy.
Do non-commodity costs apply to gas as well as electricity?
Some do. Gas has its own network (transportation) charges collected by National Gas and the regional gas distribution networks, and the Climate Change Levy applies to gas too. Schemes such as the Renewables Obligation, Feed-in Tariffs, Contracts for Difference and the Capacity Market are electricity-only, because they support electricity generation.
Can non-commodity costs change during my fixed contract?
It depends on your contract type. A fully fixed contract normally bakes an estimate of these costs into your unit rate for the term. A pass-through contract passes on the actual cost of some or all of them, which can move your bill even though the energy price is fixed. Check your contract to see which applies.
Why do network charges vary by time of day?
Distribution network charges are commonly set in bands that are more expensive at peak demand times, typically weekday early evenings, and cheaper overnight and at weekends. This is a deliberate signal from the network operator to encourage using less power when the network is under the most strain.
Who actually sets each of these charges?
Different bodies administer different costs: your regional electricity distributor sets DUoS, NESO sets TNUoS, BSUoS and the Capacity Market, the Low Carbon Contracts Company runs the CfD Supplier Obligation, Ofgem administers the Renewables Obligation and Feed-in Tariffs, and HMRC sets the Climate Change Levy. Your supplier collects all of them through your bill.
Where can I read about the Climate Change Levy specifically?
See our dedicated guide to the Climate Change Levy, which covers current rates, who is exempt, and how Climate Change Agreement discounts work.
See what your business could pay
Enter your postcode for live business energy prices. Free, with no obligation to switch.
Sources
- Ofgem, Non-domestic glossary of terms
- National Grid Electricity Distribution, Use of system charges
- NESO, Transmission Network Use of System (TNUoS) charges
- NESO, Balancing Services Use of System (BSUoS) charges
- NESO, Capacity Market
- Low Carbon Contracts Company, Supplier and Shipper information
- Ofgem, Renewables Obligation (RO)
- Ofgem, Feed-in Tariffs (FIT)
- HMRC, Climate Change Levy rates
Ready to see what your business could pay?
Compare live business electricity and gas prices for your premises in about a minute. No obligation to switch.